Microsoft Project 2007 Tutorials©
These tutorials were developed by Dr.Erik
Larson and
the
They cannot be used without his permission.
Playback of these video tutorials requires a
PC based computer running
Microsoft Internet Explorer 5.0 or higher and
Windows Media Player/WMV compatible video players.
To start a tutorial click on the link in the Tutorial
Number column.
Those of you familiar with MS
Project 2003 may want to look at Tutorial 30 first.
|
Video Tutorials for Microsoft Project
2007© |
||
|
File Name |
Topics |
Length (Mins) |
|
Introduction:
What you see when you start MS Project 2007 |
2:21 |
|
|
How to
create a WBS |
2:07 |
|
|
How to code
a WBS |
0:34 |
|
|
How to use
the Yellow Sticky approach to map out a network |
2:02 |
|
|
How to
enter estimated duration |
1:25 |
|
|
How to
enter predecessor information to create a project schedule |
1:59 |
|
|
How to
change a timescale |
1:40 |
|
|
How to use
the Gantt chart wizard |
1:00 |
|
|
|
How to
assess the sensitivity of a network A) Using
the schedule table to assess slack B) The
difference between free slack and total slack |
2:26 3:00 |
|
How to
introduce lags into a schedule |
1:40 |
|
|
How to
display the schedule as a network A) How to
hide summary tasks B) How to
manually move network nodes |
2:18 |
|
|
A) How to
create a resource pool B) How to
enter pay rate |
2:46 2:37 |
|
|
A) How to
assign resources to specific tasks B) Why
durations change when you add resources |
2:27 |
|
|
How to
designate a start date for a project |
1:01 |
|
|
How to
insert milestones into your plan |
1:14 |
|
|
How to
alter the work calendar |
1:41 |
|
|
Printing I A) How to
reduce the number of pages by scaling B) How to
fit figures to a specific number of pages |
1:44 |
|
|
Printing II A) How to
use print preview B) How to
print a specific window |
1:47 |
|
|
How to
insert titles for figures and change location of legends |
1:53 |
|
|
How to
assess whether resources are over allocated |
1:52 |
|
|
|
How to
resolve resource over allocations by leveling A) Overview B) Leveling
within slack C) Leveling
outside of slack |
0:30 2:05 2:04 |
|
How to find
the total costs of the project by tasks and resources |
1:00 |
|
|
How to
generate a cash flow statement A) Weekly
cash flow B) Monthly
cash flow |
1:28 |
|
|
How to save
a plan as a baseline |
0:47 |
|
|
How to
insert a status date |
0:46 |
|
|
How to
record actual progress on a project |
2:49 |
|
|
How to
obtain earned value performance information |
2:21 |
|
|
How to
examine schedule variance in real time |
1:59 |
|
|
How to get
CPI and SPI |
1:25 |
|
|
Some major
changes between MS Project 2007 and earlier version |
2:17 |
|